AsBuilt of a Dust Collection System
January 9, 2023
The Challenge
AsBuilt was contracted for the design and engineering of a coal handling wash down system. Water pressure and flow requirements were to be communicated at each discharge point within the systems.
The Solution
Laser scanning was performed for pipe routing and for the locating of spray nozzles throughout the structure of the system
Deliverables