AsBuilt of a Dust Collection System
January 9, 2023
The Challenge
A power plant was planning on upgrading piping along the HRSGs.
The Solution
The piping at three separate units was scanned from the top of the HRSGs all the way down each level of the units, to the pipe rack containing the HRH line that all three tie into.