Knowledge

Insights from the field

Real projects, technical deep dives, and industry trends from the AsBuilt 3D team. Learn how 3D laser scanning solves problems in power, manufacturing, and complex facilities.

Articles

Featured work and insights

Technical articles, case studies, and industry updates from our team

Essential reading

FAQs

Find answers to common questions about our scanning, modeling, and project delivery.

What makes a good scan?

A good scan captures complete geometry with consistent accuracy across the entire facility. We use multiple scanner positions, overlap coverage, and field verification to ensure no critical details are missed. The result is a point cloud dense enough for reliable modeling and decision-making.

How long does processing take?

Processing time depends on scan complexity and deliverable scope. Simple scans may take one to two weeks; large industrial facilities with full BIM modeling can take four to six weeks. We provide a timeline estimate during the scoping phase.

Can you scan while we operate?

Yes. We plan scans around your operational schedule and safety protocols. For active facilities, we coordinate with your team to minimize disruption while capturing complete data. Some areas may require temporary shutdowns depending on safety requirements.

What accuracy should we expect?

Laser scanning typically achieves accuracy within 1.5 to 2 millimeters for industrial environments. We can achieve tighter tolerances for specific areas if required. Accuracy depends on distance, surface reflectivity, and registration quality.

Do you travel nationwide?

We execute projects across the United States, Canada, and Mexico. Travel, mobilization, and site logistics are factored into project scope and pricing. Contact us to discuss your location and project requirements.

Need more clarity?

Reach out to our team directly.

Talk with an AsBuilt Engineer

Talk with our team about your facility, scope, and objectives to determine the right capture, modeling, and analysis approach.